Injection moulding projects are usually systems, not single machines

A business may say it is buying an injection moulding machine when the project actually includes a press, mould, hot runner, temperature controls, material handling, cooling equipment, automation and installation.

That difference matters for financing.

The lender needs to see which parts of the budget are identifiable equipment, which parts are specialized tooling and which parts are installation or other project costs.

Start with the press

The press is the core asset, so describe it clearly.

Useful information includes the manufacturer, model, year, clamp tonnage, control system, new or used status, seller and purchase price.

If the press is new, the vendor quote will usually provide most of that information.

If it is used, condition, service history, controls and seller details can become more important.

The mould should be shown separately from the press

A mould can be essential to production while being highly specific to one product or customer program.

That makes it different from the press itself.

If the project includes one or more moulds, identify each mould and show the price separately.

If a mould is already owned by the customer or supplied by another party, explain that too.

The financing source can then decide how it wants to treat the mould within the overall structure.

Hot runners and controllers can add meaningful cost

Hot-runner systems, temperature controllers and related controls may represent a meaningful part of the tooling package.

Do not bury them inside one mould number if they are separately priced.

A clear breakdown helps the lender understand what is being purchased and which components have value outside the core press.

Auxiliaries can turn one press into a complete moulding cell

A working moulding cell may also need dryers, loaders, granulators, chillers, temperature-control units, conveyors or other material-handling equipment.

Those assets may come from the press vendor or from separate suppliers.

List the major auxiliaries and their costs instead of assuming the lender will treat one combined project total as self-explanatory.

Robots and automation should be identified as their own equipment

A moulding project may include a robot for part removal, machine tending, inspection, downstream handling or packaging.

If automation is part of the project, show the robot, controls, guarding, end-of-arm tooling and integration separately where possible.

This makes it easier to understand how much of the request relates to the press and how much relates to the larger production cell.

Our robotics and automation financing guide goes deeper into integrated automation projects.

Used injection moulding equipment needs configuration details

A used press can be financeable, but the lender needs more than the year and asking price.

Provide the manufacturer, model, clamp tonnage, controls, seller and condition information.

If the machine has been rebuilt, upgraded or had a control retrofit, document what changed.

Also confirm what is not included. A used press sold without the robot, dryer, chiller or moulds needed for your process may create a much larger total project than the listing price suggests.

Service support can matter as much as machine age

An older press may still fit the operation well if the controls are supported, parts are available and qualified service can be obtained.

A newer machine with obsolete or unsupported controls can create a different problem.

The financing source is not performing a technical inspection, but the buyer should understand serviceability before committing to the equipment.

Installation can materially change the project budget

Moving and commissioning an injection moulding system may involve rigging, electrical work, cooling-water connections, compressed air, foundations, material handling and other plant work.

Separate those costs from the press and tooling.

Some financing sources may consider certain project costs while others focus primarily on the equipment, so the full budget should be disclosed before approval and funding are expected.

Explain what the system will produce

The lender does not need a technical sales presentation, but it does need business context.

Explain what the company manufactures, what the new system will produce and why the equipment is being purchased.

The project may replace an older press, add capacity, support a new customer program, bring outsourced production in house or add a new product line.

If the purchase supports a new contract or program, describe the opportunity without treating projected revenue as guaranteed.

Example: a $650,000 moulding-cell expansion

Consider an illustrative manufacturer buying a $360,000 injection moulding press.

The project also includes a $120,000 mould and hot-runner package, $55,000 of dryers and temperature-control equipment, a $70,000 robot and guarding package, and $45,000 of rigging, electrical and commissioning costs.

The press is $360,000, but the complete project is $650,000.

If the business asks for financing based only on the press quote, the lender sees barely more than half of the real project.

A clearer request shows the press, mould, auxiliaries, robot and installation separately and explains how they work together as one production cell.

The financing source can then decide which costs fit its structure and what cash contribution or additional information may be required.

This example is illustrative. Different lenders treat tooling, automation and installation costs differently.

Multi-vendor projects should be organized before they are submitted

A press may come from one supplier, moulds from another and automation from a third.

That is manageable, but the financing request should show the full supplier list, project budget, deposit requirements and delivery schedule.

If the purchases are connected, present them as one coordinated manufacturing project instead of several unrelated requests.

Our guide to financing multiple manufacturing machines explains how to organize a multi-asset request.

What should you provide?

  • Press vendor quote or purchase agreement
  • Manufacturer, model and year
  • Clamp tonnage and control system
  • New or used status
  • Mould pricing
  • Hot-runner and controller pricing
  • Auxiliary equipment list
  • Robot or automation package
  • Seller information
  • Installation and commissioning costs
  • Deposit and delivery schedule
  • Business purpose for the project

Give the lender the full moulding project, not only the press

The strongest financing request makes the complete system easy to understand.

Show the press, moulds, auxiliaries, automation, seller, installation costs and timing from the beginning.

Raymond Leigh can then review the complete transaction and route it based on the business, equipment and financing structure.

Next Step

Let's see if we can help!

A short conversation is usually enough to tell you which financing options fit and what they could look like.

Get financed now
About the author
Alexander Schnavel
Managing Partner & Co-Founder

Alexander Schnavel is Managing Partner & Co-Founder at Raymond Leigh, a Montreal-based equipment finance brokerage. After four years in investment banking and deal origination, he now works with businesses and equipment vendors on equipment financing, refinancing and sale-leaseback transactions.

View full profile