Financing Equipment With Long Lead Times and Progress Payments

Custom machinery can require payments months before delivery. Financing needs to be planned around the build schedule, not only the final invoice.

Reviewed byRévisé par
Last reviewedRévisé le
Published
October 12, 2026
Updated
October 20, 2026

The financing problem starts with the calendar

A stock machine can be quoted, delivered and funded in a relatively short window. A custom machine may spend months in engineering, fabrication, testing and shipment before it reaches the buyer’s floor.

During that period the vendor may require several payments. If the financing source normally funds only at delivery, the business can face a large cash requirement long before the asset is ready to use.

Map every payment before choosing the financing route

Start with the commercial contract. Show when money is due and what event triggers each payment.

StageQuestion to answer
OrderHow much is due to start the build?
EngineeringIs payment tied to approved drawings or design work?
FabricationWhat proves the milestone has been reached?
Factory acceptanceWho signs off and what happens if the test fails?
ShipmentIs final payment required before the machine leaves?
InstallationAre local suppliers paid separately?
Final acceptanceWhen does the project become fully operational?

The exact sequence differs by vendor. The important point is that the financing request matches the real payment schedule.

Credit approval and progress funding are different decisions

A financing source may be comfortable with the borrower and still be unwilling to advance money against an unfinished machine. Another source may consider staged funding if the vendor, contract and milestones are clear.

That is why approval timing and cash-disbursement timing should be discussed separately. A business can be “approved” and still need its own cash for early build stages.

Vendor strength and contract quality matter more before the asset exists

When money is advanced before completion, the financing source has less finished collateral to rely on. It may therefore pay more attention to the vendor, cancellation terms, refund provisions, factory-acceptance process and evidence that each stage has been completed.

A large established OEM with a detailed contract is easier to understand than a new supplier requesting a large unsecured payment against a vague percentage-complete estimate.

Keep the deposit question separate

A deposit may be part of the long build cycle, but deposits create their own questions about refunds, reimbursement and borrower contribution. For a long-lead equipment project, the important issue is how the payment schedule, build timeline and financing structure work together.

For the deposit itself, see financing equipment before delivery.

Multi-vendor production lines need one master schedule

A production line can involve an OEM, robot integrator, controls supplier, conveyors and local installation contractors. Each may have a different invoice and payment date.

Create one schedule showing every expected payment and the milestone attached to it. That lets the financing source see the highest cash requirement and when identifiable equipment actually exists.

Our guide on financing a full manufacturing production line covers the broader project structure.

Example: map the payment schedule before the machine is finished

Assume a manufacturer orders an illustrative $600,000 automated production cell with an eight-month build schedule.

The integrator asks for $60,000 when the order is signed, $120,000 after engineering is approved, $180,000 when the main cell is assembled, $180,000 after the factory acceptance test and $60,000 after installation and final acceptance.

The business should not wait until month seven to ask how the financing will work. By then, $360,000 may already have been required before shipment.

A better approach is to give the financing provider the full schedule at the beginning. The lender can then explain which stages, if any, it is prepared to fund, what evidence it will need before each advance and how much cash the buyer may have to contribute.

The financing timeline should also include delivery risk. If the factory acceptance test moves back by six weeks, the lender may need updated invoices, a revised delivery date or an extension to the approval.

For a long-lead project, approval and funding are two different events. The business needs both the credit decision and the release schedule to match the vendor contract.

All amounts and milestones in this example are illustrative. Actual structures depend on the transaction and financing source.

Delays should be raised before they become a funding problem

Long builds move. Components arrive late, acceptance tests fail, shipping dates change and installation slots are missed. If a material milestone changes, tell the financing source early. The file may need updated invoices, an approval extension or revised evidence before the next advance.

Hiding the delay until final funding is requested usually makes the closing harder.

The vendor has a role in making the financing work

On vendor-led transactions, the seller should provide a clear contract, equipment specification, milestone schedule and evidence for each requested payment. Dealers and OEMs can read the vendor-side counterpart in how equipment vendors can finance a customer before the machine is ready to ship.

If a machine has a long build cycle, send Raymond Leigh the vendor proposal and milestone schedule before the first major payment is due.

Next Step

Let's see if we can help!

A short conversation is usually enough to tell you which financing options fit and what they could look like.

Get financed now
About the author
Alexander Schnavel
Managing Partner & Co-Founder

Alexander Schnavel is Managing Partner & Co-Founder at Raymond Leigh, a Montreal-based equipment finance brokerage. After four years in investment banking and deal origination, he now works with businesses and equipment vendors on equipment financing, refinancing and sale-leaseback transactions.

View full profile